"DataSite Orlando’s purpose-built facility is a fortress, using the latest backup infrastructure technologies that provide our clients, with the peace of mind that their mission critical systems will remain accessible and secure at all times."

-- Bob Gambotz Chief Operating Officer at Novatus, Inc.
  • How often does DataSite test the generators?
  • DataSite performs a generator test every week. Additionally, a full load test is performed once each quarter. The load test is performed using the on-site loadbank system simulates a full load on the generator plant. The loadbank system is critical for effective generator testing. Without a loadbank... more

Read More